21
NOV
2016

Door Installation at 2nd floor Jabez Building

The doors are now installed at the second floor Jabez building. Please continue to support and pray for the building.

15055643_309663889432641_3382202535125302021_n 15079058_309663906099306_7937304532800622436_n-1

Leave a Reply

*

captcha *

Return to Top ▲Return to Top ▲